Track Record

Backed by 175 years of marine experience and + 1000 installations, customers around the world rely on us for timely, predictable and dependable results. Taking the valuable experience from each project into the next, we are installing heavier and higher turbines, faster than ever before – reducing your project’s costs while improving efficiency, health and safety.

Fred. Olsen Windcarrier projects

Go back

2021 Transformer and gearbox campaign Bold Tern

Site North Sea
Vessel Bold Tern
Turbine model Vestas V164
Time period 2021
Scope of work Transformer and gearbox campaign
Go back

2021 Transformer and gearbox campaign

Site North Sea
Vessel Blue Tern
Turbine model Vestas V164
Time period 2021
Scope of work Transformer and gearbox campaign
Go back

2020 Transformer exchange

Site North Sea
Vessel Jill
Turbine model Senvion 6.2M126
Time period 2020
Scope of work Transformer exchange
Go back

2020 Accommodation

Site North Sea
Vessel Jill
Turbine model V80-2.0MW
Time period 2020
Scope of work Accommodation
Go back

2020 Gearbox exchange

Site North Sea
Vessel Blue Tern
Turbine model SWT-3.6-120
Time period 2020
Scope of work Gearbox exchange
Go back

2020 Generator exchange

Site North Sea
Vessel Blue Tern
Turbine model SWT-3.6-120
Time period 2020
Scope of work Generator exchange
Go back

2020 Blade exchange V164

Site North Sea
Vessel Blue Tern
Turbine model V164
Time period 2020
Scope of work Blade exchange
Go back

2020 Blade re-positioning

Site North Sea
Vessel Blue Tern
Turbine model V164
Time period 2020
Scope of work Blade re-positioning
Go back

2020 Blade exchange Haliade 150

Site North Sea
Vessel Blue Tern
Turbine model Haliade 150
Time period 2020
Scope of work Blade exchange
Go back

2020 Cable work

Site North Sea
Vessel Brave Tern
Time period 2020
Scope of work Cable work
Go back

2019 Transformer exchange

Site North Sea
Vessel Jill
Turbine model OSS
Time period 2019
Scope of work Transformer exchange
Go back

2019-2020 Blade voyage

Site North Sea
Vessel Bold Tern
Turbine model Vestas V90 & V112
Time period 2019-2020
Scope of work Blade voyage
Go back

2019 Gearbox exchange

Site North Sea
Vessel Jill
Turbine model Senvion 5M
Time period 2019
Scope of work Exchange of gearbox
Go back

2019 Generator exchange

Site North Sea
Vessel Jill
Turbine model SWT-3.6-120
Time period 2019
Scope of work Exchange of generator
Go back

2019 Blade exchange

Site North Sea
Vessel Blue Tern
Turbine model Haliade 150
Time period 2019
Scope of work Blade exchange
Go back

2018 Blade exchange

Site North Sea
Vessel Bold Tern
Turbine model SWT-6.0-154
Time period 2018
Scope of work Exchange of 1 x blade
Go back

2017 Generator exchange

Site North Sea
Vessel Bold Tern
Turbine model SWT-6.0-154
Time period 2017
Scope of work Generator exchange (blades removed and replaced)
Go back

2017 Gearbox exchange 1

Site North Sea
Vessel Bold Tern
Turbine model SWT.6.0-154
Time period 2017
Scope of work Exchange 1 x gearbox
Go back

2017 Gearbox exchange 2

Site North Sea
Vessel Bold Tern
Turbine model SWT.6.0-154
Time period 2017
Scope of work Exchange of 1x gearbox
Go back

2017 Nacelle replacement

Site North Sea
Vessel Brave Tern
Turbine model Areva M5000-116
Time period 2017
Scope of work Replacement of nacelles (rotors removed and replaced)
Go back

2016 Subsea structure installation

Site North Sea
Vessel Bold Tern
Time period 2016
Scope of work Installation of subsea structures around damaged met mast
Go back

2016 Gearbox exchange

Site North Sea
Vessel Brave Tern
Turbine model SWT-3.6-120
Time period 2016
Scope of work Exchange of 1 x gearbox
Go back

2016 Blade repair campaign

Site North Sea
Vessel Bold Tern
Turbine model V80-2.0MW
Time period 2016
Scope of work Blade repair campaign
Go back

2015 Blade exchange

Site North Sea
Vessel Bold Tern
Turbine model AD5-112
Time period 2015
Scope of work Exchange 1 x blade with option of one more
Go back

2015 Blade re-installation

Site North Sea
Vessel Bold Tern
Turbine model V80-2.0MW
Time period 2015
Scope of work De-install blades for repair work on deck. Re-installation.
Go back

2015 Blade exchanges

Site North Sea
Vessel Bold Tern
Turbine model SWT-3.6-120
Time period 2015
Scope of work 1 x blade exchange (Butendieck) & 1 x 3 blades exchange (Meerwind)
Go back

2015 Transformer exchange

Site North Sea
Vessel Brave Tern
Turbine model Senvion 6.2M126
Time period 2015
Scope of work Disassembly of blade and rotor hub. Exchange of transformer.
Go back

2015 Rotorstar exchange

Site North Sea
Vessel Brave Tern
Turbine model Adwen 5MW
Time period 2015
Scope of work Removal and reinstallation of 3 rotorstars and 3 nacelles. Additional damaged rotorstar changed with custom-built blade stiffening bag
Go back

2013 Blade exchange

Site North Sea
Vessel Bold Tern
Turbine model SWT-6.0-120
Time period 2013
Scope of work Exchange 3 x blades
Go back

2013 Transformer and gearbox exchange

Site North Sea
Vessel Bold Tern
Turbine model SWT-3.6-107
Time period 2013
Scope of work Exchange 1 x transformer and exchange 1 x gearbox

Download our track records

Case Studies

Moray East

Moray East is Scotland's largest offshore windfarm to date with 100 V164-9.5 turbines. Read more

Bold Tern installing on Hornsea One

Hornsea One

Being part of installing the worlds’ largest wind farm to date is part of our vision of supporting the quest to establish tomorr… Read more

Fixed Blue Brave Tern Hohesee

Hohe See and Albatros

Hohe See and Albatros wind farms are located in the German part of the North Sea and was at the time, the largest offshore wind … Read more

Brave Tern and Bold Tern in Port Esbjerg 2018

Horns Rev 3

Horns Rev 3 is Denmark’s largest offshore wind farm to date and will provide up to 425.000 households with clean energy. Read more

Borkum Riffgrund 2 installation

Borkum Riffgrund 2

Fred. Olsen Windcarrier finished installing 56 V164-8.0MW turbines on Borkum Riffgrund 2 in the German North Sea on 31 August 20… Read more

Bow

Galloper

Fred. Olsen Windcarrier joined the Galloper installation project midway to support timely completion for client Siemens Gamesa R… Read more

Block Island Tower 1 Complete

Block Island

Fred. Olsen Windcarrier successfully completed the installation of the US’s first offshore wind farm on 19th August 2016. Read more

Windcarrier facts

20% of all offshore wind turbines installed outside China
5,200+MW of clean, green energy installed

It has been a pleasure to work with the crew from Fred. Olsen Windcarrier. The combination of a competent and proactive crew and an experienced installation team from [MHI] Vestas has led to fast installation times [on Hornsea One] throughout the project. – James Gibbs, Offshore Installation Manager, Ørsted

Other pages

Bridge (2)

Versatile offshore installation vessels for the full wind farm lifecycle

Our flexible and efficient offshore installation vessels (jack-ups) provide you a cost-effective solution across transport and i… Read more

Deck (1)

Services - improving and executing cost-effective installations and O&M

Whether you need a full-service solution or custom-fit selection of services, we support competitive installations with dependab… Read more