Video

Wikinger Offshore Wind Farm - Full Length

Fred. Olsen Windcarrier's jack-up installation vessel Brave Tern installed 70 AD 5-135 Adwen turbines on Iberdrola's Wikinger Offshore Wind Farm. Installation began in January 2017 and was completed on 22 October 2017.

Wikinger Offshore Wind Farm - Short

A short film showing the highlights of Fred. Olsen Windcarrier installing 70 AD 5-135 turbines on the Wikinger Offshore Wind Farm in the Baltic Sea.

Block Island Offshore Wind Farm

In 2016, Fred. Olsen Windcarrier installed the first ever offshore wind farm in the US: Block Island.

Read case study

Brave Tern arrives in Newport, RI

Brave Tern arrives in Newport, RI after sailing across the Atlantic on her way to the Block Island Wind Farm.

Fred. Olsen Windbase

Fred. Olsen Windcarrier is delighted to provide an early insight into the Fred. Olsen Windbase (FO Windbase) solution, an offshore facility for long-term operations and maintenance that is modular in design and constructed to maximise its impact on LCOE.

Global Tech I

In 2014, Fred. Olsen Windcarrier installed 75 towers and nacelles and 22 rotor stars of the 80 5MW AREVA turbines at the Global Tech I site within eight months.

Read case study

Borkum Riffgat

In 2013, Fred. Olsen Windcarrier installed 30 complete turbines at the Borkum Riffgat site in the German North Sea.

Read case study

Alstom Haliade demonstrator

In 2013, Fred. Olsen Windcarrier’s Bold Tern installed the Alstom Haliade™ 8MW demonstrator turbine at the Belwind site.

Read case study

On board the Brave Tern

Take a look on board our jack-up vessel Brave Tern...

Think First - Act Safely

For us, these are not simply words.

Push-on test Bayard 5 (full length)

At Humber Gateway Offshore Wind Farm, UK in Challenging sea conditions with between 2.0 and 2.1m Hs. February 8 2017.

Push-on test Bayard 5 (Short)

At Humber Gateway Offshore Wind Farm, UK in challenging sea conditions with between 2.0 and 2.1m Hs. February 8 2017.